TAP-TSI

Telematics Applications for Passenger Services

TAP-TSI

Introduction

On 5 May 2011 the European Commission formally adopted the Telematics Applications for Passenger Services Technical Specifications for Interoperability (TAP TSI). It entered into force on 13 May 2011 as the Commission Regulation (EU) No 454/2011.

The purpose of the TAP TSI is to define European-wide procedures and interfaces between all types of railway industry actors (passengers, railway undertakings, infrastructure managers, station managers, public transport authorities, ticket vendors and tour operators). It will contribute to an interoperable and cost-efficient information exchange system for Europe that enables the provision of high quality journey information and ticket issuing to passengers in a cost effective manner, thus also fulfilling requirements of the Passenger Rights Regulation (Regulation (EC) No 1371/2007).

The TAP TSI shall be implemented in three phases:

  • Phase 1: implementation preparation, containing detailed IT specifications, a master plan and a governance model
  • Phase 2: development of the data exchange system
  • Phase 3: deployment of the data exchange system

UIC has administered the TAP TSI Phase 1 on behalf of the European rail sector and the Ticket Vendors in cooperation with its members and the representative bodies of the sector. A Steering Committee and a Project Team was established in July 2011. The team was able to draw on the experience of a number of European stakeholders via expert working groups. The TAP TSI concerns a large number of stakeholders within the European rail and rail retailing sector.

On 13 May 2012, the Phase One deliverables were submitted to the European Commission (DG MOVE) and the European Rail Agency (ERA). These deliverables are the detailed IT specifications that describe the TAP TSI system, implementation guides, an implementation masterplan, a governance proposal for Phases 2 and 3, and change requests to be processed by the ERA TAP Change Control Management process.

On 31 October 2012, the European Railway Agency (ERA) submitted its recommendation on the acceptance of the deliverables to the Commission. ERA confirms the Phase One deliverables are fit for purpose.

Facts

Regulation
Commission Regulation (EU) No 454/2011
Adopted
5 May 2011
In force
13 May 2011
Phase 1 submitted
13 May 2012
ERA recommendation
31 October 2012

Deliverables

CodeDocument
120703_taf_tap_steco_1_drft_minutes_rev_b.pdf
120925_dg-move_en-com_reg_a.pdf
120925_masterplan_project_intro.pptx
120928_taf_tap_steco_2_fnl_mins_pst_mtng-2.pdf
120928_tap_steco_10_drft_fnl_mins.pdf
121121_tap_sc11_mins_b.pdf
130117_tap_sc12_mins_b_wb_cl.pdf
130417_tap_sc13_minutes_b.pdf
20110907_tap_phase_one_report_august_2011_final-2.pdf
20111002_tap_phase_one_report_september_2011_final-2.pdf
20111107_tap_phase_one_report_october_2011_final.pdf
20111208_tap_phase_one_intermediate_report_final.pdf
20120103_tap_phase_one_report_nov_-_dec_2011_final.pdf
20120126_taf_tap_masterpl_kick-off_tap_final.pdf
20120207_tap_phase_one_report_jan_2012_final.pdf
20120302_tap_phase_one_report_feb_2012_final.pdf
20120402_draft_cr_on_b9_sn_v02.doc
20120403_draft_cr_on_tap_b30_sn_v01.doc
20120403_draft_cr_on_tap_bp4216_sn_v01.doc
20120406_tap_phase_one_report_mar_2012_final.pdf
20120416_draft_cr_on_b8_sn_v04.doc
20120419_draft_cr_on_b30_stpr1_sn_v01.doc
20120419_draft_cr_on_b30_stpr_train_sn_v01.doc
20120430_draft_cr_on_b30_stpr_receipt_sn_v02.doc
20120507_tap_phase_one_report_apr_2012_final.pdf
20120629_ru_im_implementation_guide_v53.pdf
20120629_tap_ru_im_implementation_guide_v53.doc
20120629_tap_ru_im_implementation_guide_v53c.pdf
20120925_tap_masterplan_template_final-2.xlsx
20120925_tap_masterplan_template_final-3.xlsx
20120925_tap_masterplan_template_final.xlsx
20120925_tap_masterpl_kick-off_item_3_final-2.ppt
20120925_tap_masterpl_kick-off_item_3_final.ppt
20120925_tap_masterpl_kick-off_ruim_d.ppt
20121115_tap_masterplanning_qa_session_-_final2_minutes_2_.pdf
3_tap_steco_7_draft_minutes_com.pdf
annex_10_taf_tap_coding_list_20120511.xls
annex_12_2_elementsspecifictostakeholders.xls
annex_12_3_messageexamples_20120510.doc
annex_12_pathrequestprocesses_20120412.doc
annex_13_operationalprocesses_20120510.doc
annex_1_ru_im_message_catalogue.xsd.zip
annex_24_glossary_tap_ruim_k_20110511.xls
annex_9_1_implementation_guidlines_reference_files_tap_an_1_v2.doc
annex_9_3_implementation_guidlines_reference_files_tap_an_3_v1.doc
annex_9_4_subsidiary_type_coding_v0.8_20120402.xls
annex_9_5_crd_referencefiles_import_template_v1.0_20120510.xls
annex_a_-_ru_im_legacy_survey_report_final.pdf
annex_b_-_retail_legacy_survey_report_final.pdf
annex_c_-_draft_fsm_requirements.pdf
annex_d_-_summary_of_bp.pdf
annex_tap_architecture_economic_evaluation_final-2.xlsx
annex_tap_architecture_economic_evaluation_final.xlsx
changeoftrackmessage.docx
commercialtraffictypedoc.doc
cr_telem00000126_track_change.pdf
cr_telem00000128_train_journey_modification.pdf
dg-move_en-com_reg.pdf
dirfulfilment_ig_amended_by_team_on_era_comments.docx
dirfulfilment_ig_final.pdf
full_service_model_consolidated_v01-2.xlsx
full_service_model_consolidated_v01.xlsx
http://www.era.europa.eu/Document-R...
indfulfilment_ig_amended_by_team_on_era_comments.docx
indfulfilment_ig_final.pdf
introduction_to_phase_one_deliverables.doc
minutes_of_the_taf-tap_masterplan_meeting_v2.pdf
path_alteration_mgmt.pdf
path_cancellation_mgmt.pdf
path_modification_mgmt.pdf
path_request_mgmt.pdf
prm_assistance_ig_amended_by_team_on_era_comments.docx
prm_assistance_ig_final.pdf
r-1015040_-_s-1186436_-_signed_-_pg_-_tap_tsi.pdf
r-1019647_-_s-1187688_-_signed_-_sp_invitation_to_tap_tsi_25_september.pdf
receiptconfirmation.doc
reservation_ig_amended_by_team_on_era_comments.docx
reservation_ig_final.pdf
retail_legacy_survey_report_final.pdf
ru_im_implementation_guide_final.pdf
ru_im_legacy_survey_report.pdf
signed-jep_invitation_kick_off_meeting_master_plan.pdf
tapsc-sr01en02final.pdf
tapsc-sr02en02_final.pdf
tapsc-sr03en03_final.pdf
tapsc04sr03.pdf
tapsc05sr02.pdf
tap_fsm_requirements_release_1.0-2.pdf
tap_fsm_requirements_release_1.0.pdf
tap_governance_proposal_final.pdf
tap_governance_v1-1_tracked.docx
tap_igs_overview_final-2.pdf
tap_igs_overview_final.pdf
tap_masterplan_-_life_cycle_costs_final-2.xlsx
tap_masterplan_-_life_cycle_costs_final.xlsx
tap_masterplan_-_timeline_overview_final-2.pdf
tap_masterplan_-_timeline_overview_final.pdf
tap_masterplan_report_final-2.pdf
tap_masterplan_report_final.pdf
tap_masterplan_v1-1_tracked.docx
tap_masterplan_workshop_2012-09-25_-_master_plan.pptx
tap_phase_one_intermediate_report_extract-2.pdf
tap_phase_one_intermediate_report_extract.pdf
tap_phase_one_masterplan.pdf
tap_retail_architecture_description_final.pdf
tap_retail_architecture_description_final_1st_review_-new_version_after_meeting_25jun12-_delivered_on_2jul12.docx
tap_retail_architecture_economic_evaluation_final-2.pdf
tap_retail_architecture_economic_evaluation_final.pdf
tap_retail_change_requests_final.pdf
tap_steco_6_final.pdf
tap_steco_8_draft_minutes_sent.pdf
tap_steco_9_drft_mins_rev_b.pdf
tap_tsi_regulation_eu_no_454_2011_-_en.pdf
tariffs_ig_amended_by_team_on_2nd_review_era_comments.docx
tariffs_ig_final.pdf
timetables_ig_amended_by_team_on_era_comments.docx
timetables_ig_final.pdf
trainjourneymodificationmessage.docx
typeofservice.doc
wg5_business_cases_overview_110214-2.pdf
wg5_incident_path_mgmt_v13-2.pdf
wg5_path_activation_v13-2.pdf
wg5_path_alteration_v19-2.pdf
wg5_path_cancellation_oa_v22-2.pdf
wg5_path_cancellation_oa_v22-3.pdf
wg5_path_cancellation_v22-2.pdf
wg5_path_cancellation_v22-3.pdf
wg5_path_modification_v17.pdf
wg5_path_request_full_harm_v23.pdf
wg5_path_request_oa_full_harm_v22.pdf
wg5_path_request_oa_part_harm_v19.pdf
wg5_path_request_part_harm_v25.pdf
wg5_path_yearly_timetable_oa_v10.pdf
wg5_path_yearly_timetable_v12.pdf
_s-1187688_-_sp_invitation_to_tap_tsi_25_september_-_registration_form.doc

Contact